Updates on the FM 148 Bypass and US 175 Frontage Road Project: What Forney Residents Should Know
As Forney continues to grow, infrastructure improvements are essential to meet the needs of its rapidly expanding population. The FM 148 Bypass and US 175 Frontage Road project is one such significant development, aimed at enhancing connectivity and traffic flow in our community. Here’s a detailed update on the project’s status, timeline, and impact on local residents.
Project Overview
The FM 148 Bypass project is designed to construct a new 2-lane undivided roadway that will connect to the proposed US 175 frontage road. This initiative is vital for easing congestion and providing better access for commuters traveling to Dallas and beyond.
Key Project Details
Schematic Approval: June 30, 2017
Environmental Clearance: April 26, 2019
Construction Cost: $60,049,999
ROW Acquisition Completed: November 2020
100% Plans Ready: April 28, 2023
Construction Completion Date: March 2026
Construction Status
As of August 2025, utilities have been successfully relocated with some minor work still pending at the FM 148 Bypass and US 175 intersection. The construction was awarded to Granite Construction with a bid of $60,049,998.99, which is just slightly above the engineer’s estimate. Residents should anticipate approximately 35 months of barricades and 735 working days from the start date.
Current and Upcoming Activities
The current construction activities include:
Flexbase installation
Excavation and embankment work
Drainage installation
Asphalt paving
Construction of retaining walls
In the coming month, crews will continue with these tasks and begin installing signs and stone rip rap to enhance drainage systems.
Traffic Impact
At this time, there are no reported traffic issues or plans for changes in traffic patterns as a result of the project. Local officials are working diligently to minimize disruptions to daily commutes.
A Commitment to Progress
As construction progresses, we encourage residents to stay informed and be patient. These enhancements will not only improve daily commutes but also contribute to a more connected and accessible Forney for years to come.